1.   Homepage      Favorite      中文版
      Home About Us News info Products Services Recruitment Contact us
      SERVICES
      Marketing
      After Services
      Question
      Downloads
      CONTACT US
      Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
      Tel: +86-592-6539999
      E-mail: bussiness@xmzzj.com

      Question
      Location:Home → Services → Question
      Drive axle maintenance
      Public date:2015-1-21   Hits:4717

      Drive axle in use, the parts can play normal function, and its maintenance is reasonable great relationship. In order to keep the product in good technical condition, extend the life of the product's features to better play, according to "regular maintenance" of the relevant provisions, time to check the oil level and replace the drive axle drive axle oil.

      Check the drive axle oil level

      1) the machine onto a flat open space, small throttle slowly moving the machine, so that the front wheel drive axle end face of the drain plug in the horizontal position. Because the drain plug while the front and rear drive axles can not be in a horizontal position, so the front and rear drive axle oil level should be checked twice.
      2) turn off the engine, the speed control lever in neutral position, the parking brake lever to the brake position to prevent the machine from moving.
      3) on both sides of the drive axle wheel area near the port plugs clean and remove oil drain plug observation, drive axle inside the oil level should be at the lower edge of the discharge port. If the oil level is below the lower edge of the discharge port, you should add the oil and clean the drive axle. After refueling should be observed for 5 minutes or so, if the oil level to remain stable.
      4) Screw on the oil drain plug.
      5) After the above operation drive axle oil level checks.

      Replace the drive axle oil, follow these steps:

      1) First start the machine running for some time, so the bridge shell impurities precipitate move to full suspension. Then the machine onto a flat open space, small throttle slowly moving the machine, so that the front wheel drive axle end face of the drain plug at the lowest position. Because the front and rear wheel drive axle end face of the drain plug at the lowest position can not simultaneously, so the front and rear axle to be carried out in multiple oil changes.
      2) turn off the engine, the speed control lever in neutral position, the parking brake lever to the brake position to prevent the machine from moving.
      3) Remove the front wheel drive axle axle drain plug and drain plug at both ends of the central plane, were put oil, and container connected.
      Note: Because this time the drive axle oil may be in a higher temperature, so to wear protective equipment, and careful to avoid personal injury.
      4) Remove the front drive axle in the middle of the oil drain plug.
      5) Start the engine, release the parking brake. Ⅰ gearbox hanging files, small throttle slowly moving the machine, so that the front wheel drive axle end face of the drain plug in the horizontal position. Then turn off the engine, gearbox hanging neutral, parking (hand) brake is braking.
      6) previously put the oil port side of the bridge to join the two ends wheel drive axle clean oil until the oil level reaches the ends of the front axle wheel rim surface discharge of oil. After refueling should be observed for 5 minutes or so, if the oil level to remain stable.
      7) Remove the front wheel drive axle drain plug at both ends.
      8) is similar to the process described above, after replacing the drive axle oil.

      Drive axle general maintenance should note the following items:

      1) regular cleaning grease, dirt and dust, especially vents to keep open. Fastening check all parts, focusing on the main reduction gear reducer and wheel rim bolts, if loose fastening must be timely.
      2) Always check whether there is leakage of the various parts, if found, should be timely maintenance excluded. Check the main gear wheel reducer and lubricating oil level within the time to add, keep the oil level requirements to ensure proper operation.
      3) The first oil change: After the first 250 hours of work in the first month or; cycle oil change: every six months or every work after 1000 hours.
      4) Check the main reducer shell (bay), wheel cover at the phenomenon has no unusual fever, if fever, you should check the oil level is in line with requirements.
      5) Check the work process has no unusual sounds, such as the discovery should stop excluded.
      6) Check the brake disc wear, with or without the presence of destructive wear, if found should be immediately removed.
      Wear 7) Check the brake pads when the friction plate on the worn grooves no longer meet the requirements should be replaced immediately.

      Previous  |  Next  |   Return to
      About Us
      Company profile
      Culture
      Organizational
      Development
      Subsidiaries
      Certificates
      Products
      Wheel Loader
      Block Handling Wheel Loader
      Excavator
      Other
      Spare Parts
      News
      Company News
      Trade News
      Exhibitions
      Videos
      Services
      Marketing
      After Services
      Question
      Downloads
      Recruitment
      Talent Concept
      Jobs
      Contact Us
      Feedback
      Contact us
      Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
      Two-dimensional [Close]

      點(diǎn)擊這里給我發(fā)消息
      點(diǎn)擊這里給我發(fā)消息
      色婷婷亚洲十月十月色天_亚洲av日韩a∨在线观看_亚洲国内伊人99综合精品_亚洲综合色一区二区三区另类

      1. 五月婷婷激情六月 | 亚洲日本一区二区三区 | 一区二区三区久久亚洲 | 中文字幕精品三区视频 | 婷婷中文字幕一区二区三区 | 伊人久久大香线蕉首页 |