1.   Homepage      Favorite      中文版
      Home About Us News info Products Services Recruitment Contact us
      SERVICES
      Marketing
      After Services
      Question
      Downloads
      CONTACT US
      Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
      Tel: +86-592-6539999
      E-mail: bussiness@xmzzj.com

      Question
      Location:Home → Services → Question
      Inspection and maintenance operations before and after the loader
      Public date:2015-1-21   Hits:14946

      Daily inspection and maintenance of pre-and post-job

      Engine, electrical, instrumentation section

      1.Check the water level in the tank。
      2.Check the fuel oil tank。
      3.Check the engine oil sump capacity。
      4.Tightness check the tubing, pipes, pipe and various parts of the。
      5.Check the battery terminal。

      Chassis part

      1.Check the hydraulic fluid amount of work。
      2.Check the tightness of the hydraulic system piping and accessories。
      3.Check the foot brake, hand brake work is reliable。
      4.Check the joystick in the neutral position is flexible and。
      5.Check the tire pressure (front: 0.30 ~ 0.32MPa, rear: 0.28 ~ 0.30MPa) is normal, tire bolts are loose, the locking force: 830N.m. Tire pressure must be controlled within the specified range, otherwise it would cause a major accident, such as a flat tire, causing casualties and losses。
      6.Check before connecting the rear propeller shaft bolt is loose, shedding phenomenon, locking force: 130 ~ 215N.m。
      7.Check the pin connecting bolt is loose。

      Bolt locking force (unlabeled bolt grade 4.8)


      Thread diametermm

      6

      8

      10
      (8.8Level)

      12
      (8.8Level)

      14

      16
      (8.8Level)

      18

      20

      22

      24

      27

      30

      36

      TorqueN.m

      4

      9.5

      48

      86

      51

      220

      112

      160

      220

      280

      410

      550

      970

      8.Check the water level, the gearbox oil level, hydraulic oil, brake fluid (brake fluid) oil level [regular maintenance according to section 3.3], check for oil spills, leaks, air leaks。
      9.Each nozzle grease filling (once a day, at least 3 to 4 times per week)。

      Start the engine

      1.Check the meter indication is normal。
      2.Check the lighting equipment, horn, wiper, brake lights work。
      3.Check the operation of the working device manipulation case。
      4.Whether listening to the low-speed operation of the engine is working properly。
      5.Engagement stall run。

       


      Next  |   Return to
      About Us
      Company profile
      Culture
      Organizational
      Development
      Subsidiaries
      Certificates
      Products
      Wheel Loader
      Block Handling Wheel Loader
      Excavator
      Other
      Spare Parts
      News
      Company News
      Trade News
      Exhibitions
      Videos
      Services
      Marketing
      After Services
      Question
      Downloads
      Recruitment
      Talent Concept
      Jobs
      Contact Us
      Feedback
      Contact us
      Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
      Two-dimensional [Close]

      點(diǎn)擊這里給我發(fā)消息
      點(diǎn)擊這里給我發(fā)消息
      色婷婷亚洲十月十月色天_亚洲av日韩a∨在线观看_亚洲国内伊人99综合精品_亚洲综合色一区二区三区另类

      1. 久久免费精品视频14 | 夜鲁夜鲁很鲁在线视频视频 | 亚洲国内自拍愉拍中文字幕 | 尤物麻豆AV在线 | 中文字幕v亚洲日本在电影 亚洲片中文字幕在线看 | 午夜福利在线观看爽爽爽 |